Drawing Of The Table - JUKI LBH-1702 Manual

Table of Contents

Advertisement

14. DRAWING OF THE TABLE

(6)
R4
180
2 drilled hole 10 on the bottom
surface Installing position of
stopper for drawer
80
4-7 drilled hole 20 V groove cut
When installing presser lifting solenoid
Drilled hole 16
20
320
2 drilled hole depth 10 (bottom surface)
Installing position of drawer
121
1130
900
600
810
85
60
Drilled hole 40
110
Drilled hole 40
25
48
A
A
60
A
A
120
2-7 drilled hole 20 depth facing
110
depth 5
When installing presser lifting
air cylinder
4-drilled hole 8
67.5
135
1200
30˚
Ø20
Ø20 V groove (4 places in A section)
Detailed machining drawing (2 : 1)
Oil drain funnel installing hole
110
30 drilled hole 51 depth facing depth 5
2-3.5 drilled hole depth 14
2-2 drilled hole depth 10 (bottom surface)
Pedal switch installing position
Drilled hole 30
42.5
Hole for operation
panel cord
4-7 drilled hole 20 depth facing depth 8.5
Control box installing hole
2-2 drilled hole depth 10 (bottom surface)
Main switch installing position
Center of main shaft of
sewing machine
R4
78
Drilled hole 17
4-2 drilled hole depth 10 (bottom
surface) Stand installing hole
71
60
70
115
180
R4
R4
40
Part No. : 14514905

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lbh-1700

Table of Contents