Shorten The Operator Arm; Position The Gate Bracket - Chamberlain RSW12U Installation Manual

Residential dc vehicular swing gate operator
Table of Contents

Advertisement

STEP 3

SHORTEN THE OPERATOR ARM

COMPACT INSTALLATION ONLY
For a compact installation the operator arm will have to be shortened.
1. Take the operator arm apart and remove the inner sleeves from the
outer tubing.
2. Cut the outer tubing of the operator arm sections to the lengths
shown.
3. Put the arm back together and adjust the arm to the measurements as
shown. Use the set screws on the arm to temporarily hold the arm in
place while determining the correct measurements.
STEP 4

POSITION THE GATE BRACKET

COMPACT INSTALLATION ONLY
NOTE: It may be necessary to attach horizontal reinforcement to the gate before attaching the gate bracket. Use the set screws on the arm to
temporarily hold the arm in place while determining the correct measurements.
1. Position the operator arm onto the output shaft so that the pin slides into the slot.
2. Measure 33 inches along the gate length from the gate hinge center.
3. Measure 27.5 inches up from the concrete pad to the gate hinge position on the gate as shown.
4. Make sure the operator arm is level and tack weld the gate bracket in this position.
Proceed to Step 5 of the installation.
Tack weld
APPENDIX
2
33"
3
4
Set Screws
27.5"
1
CUT
2
10"
CUT
4"
3
23"
Gate
Hinge
Center
39
long arm section
CUT
22"
4"
short arm section
20"
Set Screws
25-1/2"
1
Slot
Output Shaft
Pin

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rsw12vdc

Table of Contents