EN
SETP:
K
1. Install (N) at the bottom of (A)
2. Open the Cap(B)on the Base(A)and fill
with water(Figure A) or and (Figure B)and
D
close with Cap(B)
3. Tighten Cover (C) onto Spring (E).
washer
Attach spring (E) to the top of the Base (A)
J
with four Screw (F) and tighten
4. Loosen Knob(H) and slide inner Tube (I)
into Outer Tube (G) and tighten Knob (H) .
Slide tube assembly into spring assembly.
5. Pump up the ball(D) by using the pump
(K) provided. maximum air pressure of 4
LBS
6. Put the washer (J) on the top of( I) and
lock it with the ball(D)
7. Use Knob (H) to adjust tube assembly
height as desirec
N
-3-
Need help?
Do you have a question about the A91-192 and is the answer not in the manual?
Questions and answers