Assembly
To assemble the machine:
1.
Head Movement
2.
Note: There are two ball handle assem-
blies with a spring-loaded bushing—these
are mounted on either end of the table
leadscrew. The remaining ball handle assem-
bly is installed on the cross feed leadscrew.
3.
Figure 12.
Page 26
Figure 12
4.
Figure 13
Figure 13.
5.
Figure 14
Figure 14.