Download Print this page

Electro Industries Shark 100S Quick Start Manual page 5

Hide thumbs Also See for Shark 100S:

Advertisement

12.Press the ENTER button to go to the meter Baud Rate setting screen (bAUd). The
meter's current Baud Rate is shown in the second line. Press the DOWN ARROW
to choose another Baud Rate. You can choose 9600 (choose this for RS485
connection), 19.2 (19200), 38.4 (38400) or 57.6 (57600). If you are using the
Ethernet option, do NOT change anything on this screen.
13.Press the ENTER button to go to the meter Protocol setting screen (Prot). The
meter's current Protocol is shown in the second and third lines. Press the DOWN
ARROW to choose another communication Protocol. You can choose Mod rtU
(Modbus RTU; choose this for RS485 connection), Mod ASCI (Modbus ASCII), or
dnp (DNP 3.0). If you are using the Ethernet option, do NOT change
anything on this screen.
14.Press the ENTER button to go to the Scroll setting screen (SCrL). The current
setting is shown in the second line. Press the DOWN ARROW to choose another
setting. You can choose YES (the meter readings will scroll on the display) or no
(the meter readings will not scroll on the display).
15.Press the MENU button twice. You will see the Store Settings screen (Stor ALL?)
The default setting is YES. To save the settings you've made, press the ENTER
button. You will see the confirmation screen (Stor ALL done) and then the meter
resets.
NOTE: If you do not want to save your settings, press the RIGHT ARROW. YES
changes to no. Press the ENTER button.
Example CT Settings:
200/5 Amps:
set the Ct-n value as 200, Ct-S value as 1.
800/5Amps:
set the Ct-n value as 800, Ct-S value as 1.
2000/5 Amps:
set the Ct-n value as 2000, Ct-S value as 1
10,000/5 Amps:
set the Ct-n value as 1000, Ct-S value as 10.
Example PT Settings:
14400/120 Volts:
set the Pt-n value as 1440, Pt-d value as 120, Pt-S value as 10.
138000/69 Volts:
set the Pt-n value as 1380, Pt-d value as 69, Pt-S value as 100.
345000/115 Volts: set the Pt-n value as 3450, Pt-d value as 115, Pt-S value as 100.
345000/69 Volts:
set the Pt-n value as 345, Pt-d value as 69, Pt-S value as 1000.
For additional programming instructions for the faceplate buttons, see Chapter 7 in your meter's User
Manual (see page QS-1).
Electro Industries/GaugeTech
Powered by Innovation™
Doc
#
E145723
Shark® 100S/200S Quickstart
MENU
ENTER
-
A
-
B
-
C
MENU
ENTER
-
A
-
B
-
C
MENU
ENTER
-
-
-
MENU
ENTER
-
A
-
B
-
C
MENU
ENTER
-
A
-
B
-
C
V.1.16
A
B
C
QS - 5

Advertisement

loading

This manual is also suitable for:

Shark 200s