Page 1
DS-LEDTVF Series *Actual configuration may vary ENG Installation video for reference only. Read and follow instruction manual for full installation. 2020-03-17 #:146-9047-4 (2020-08-20)
Page 2
WARNING ENG - This product is designed to be installed on plywood walls. Hardware is included for plywood installation. This product is designed to be installed on flat, unobstructed, vertical walls. Do not install on curved or angled walls. Before installing make sure the supporting surface will support the combined load of the equipment and hardware.
Page 3
Tools Needed for Assembly. ENG To properly tighten screws: Tighten until screw head makes contact, then tighten another 1/2 turn. Do not overtighten screws. 5/32" (4mm) +1/2 3/8" (10mm) 2.5mm 2020-03-17 #:146-9047-4 (2020-08-20)
Parts (Before beginning, make sure you have all parts shown below). Parts List left column right column inside column vertical spacer Description A left column B right column C inside column D vertical spacer E horizontal spacer F extrusion connector G 3mm allen wrench two-tip T-handle H M5 x 5mm set screw #14 x 1.75"...
Page 5
top horizontal asy bottom horizontal asy top left top right horizontal asy horizontal asy bottom left bottom right horizontal asy horizontal asy 2020-03-17 #:146-9047-4 (2020-08-20)
Page 6
Optional: If connecting two top horizontal extrusions, first remove inner hook-on brackets. Remove and save hardware. Use extrusion connectors to connect top horizontal 2.5mm extrusions. H (8) F (4) 2020-03-17 #:146-9047-4 (2020-08-20)
Page 7
Replace one hook-on bracket in between connected extrusions. Use saved hardware. Optional: If connecting two bottom horizontal extrusions, first remove inner hook-on brackets Remove and save hardware. 2020-03-17 #:146-9047-4 (2020-08-20)
Page 8
Use extrusion connectors to connect bottom 2.5mm horizontal extrusions. F (3) H (6) Replace one hook-on bracket in between connected extrusions. Use saved hardware. 2020-03-17 #:146-9047-4 (2020-08-20)
Page 9
WARNING ENG - When installing Peerless wall mounts on a wood stud wall covered with plywood, verify that the wood studs are a minimum of 2" x 4" nominal size and plywood is a minimum Grade BC, 1/2" (13 mm) thick. Plywood may be covered by gypsum board (drywall) up to 5/8"...
Page 10
7/8" (22mm) minimum for mounting clearance Level top horizontal extrusion and mark mounting holes on plywood (must be 2.5" minimum Grade BC, 1/2" (13mm) thick.) (64mm) display tile 2020-03-17 #:146-9047-4 (2020-08-20)
Page 11
1.75" (44mm) 5/32" 5/32" (4mm) (4mm) Drill mounting holes into supporting surface (1.75" (44mm) minimum depth required). Level extrusion. Install using wood screws provided. 3/8" (10mm) I (5) Maximum 80 in. • lb (9 N.M.). 2020-03-17 #:146-9047-4 (2020-08-20)
Page 12
Edges must be flush. Secure vertical spacers to the wall flush with the horizontal extrusion. 3/8" (10mm) D (2) I (2) 2020-03-17 #:146-9047-4 (2020-08-20)
Page 13
Use third vertical spacer to align bottom horizontal extrusion flush with vertical spacer, then mark mounting holes on plywood (must be minimum Grade BC, 1/2" (13mm) thick.) 58.68" (149cm) Edges must be flush. 2020-03-17 #:146-9047-4 (2020-08-20)
Page 14
1.75" (44mm) 5/32" 5/32" (4mm) (4mm) Drill mounting holes into supporting surface (1.75" (44mm) minimum depth required). Use third vertical spacer to align bottom horizontal extrusion flush with vertical spacer, then install using wood screws 3/8" provided. (10mm) I (5) Maximum 80 in.
Page 15
Remove vertical spacer. 3/8" (10mm) D (2) I (2) 2020-03-17 #:146-9047-4 (2020-08-20)
Page 16
Hook on and secure outer vertical columns. "L" and "R" markings designate left and right Tighten hardware. column. J (8) 2020-03-17 #:146-9047-4 (2020-08-20)
Page 17
Hook on and secure all inside vertical columns. Tighten hardware. J (16) C (4) 2020-03-17 #:146-9047-4 (2020-08-20)
Page 18
Loosen hardware on vertical columns. 2020-03-17 #:146-9047-4 (2020-08-20)
Page 19
Plumb and level outer columns, then tighten hardware. Tighten hardware on four corner wall plates. Tighten. Tighten. 2020-03-17 #:146-9047-4 (2020-08-20)
Page 20
Tie a string between top slots on outer columns in order to level the depth of each vertical column. Loosen, adjust, tighten. Optional leveling for bowed walls Loosen. Insert. Tighten. 2020-03-17 #:146-9047-4 (2020-08-20)
Page 21
Tie a string between bottom slots on outer columns in order to level the depth of each vertical column. Loosen, adjust, tighten. Optional leveling for bowed walls Loosen. Insert. Tighten. 2020-03-17 #:146-9047-4 (2020-08-20)
Page 22
Tighten or loosen to adjust height. With the string still attached, level the height of each column 2020-03-17 #:146-9047-4 (2020-08-20)
Page 23
Adjust inner columns to fit horizontal spacers. Tighen column hardware after spacing. Start from the left column. E (2) 2020-03-17 #:146-9047-4 (2020-08-20)
Page 24
Continue adjusting inner columns to fit horizontal spacers until all are level. Tighen column hardware after spacing E (2) 2020-03-17 #:146-9047-4 (2020-08-20)
Page 25
Remove all spacers. E (2) 2020-03-17 #:146-9047-4 (2020-08-20)
Page 31
L (2) 1/8" (3mm) ENG Display module not included. 2020-03-17 #:146-9047-4 (2020-08-20)
Page 32
ENG Attach display module frames onto keyhole slot. Attach and tighten connecting hardware, then run cables one at a time starting from the bottom left. S (20) 2020-03-17 #:146-9047-4 (2020-08-20)
Page 33
ENG Finish attaching display module frames. Attach and tighten connecting hardware, then run cables one at a time starting from the bottom left. S (4) 2020-03-17 #:146-9047-4 (2020-08-20)
Page 35
ENG To remove, start from the top right. 2020-03-17 #:146-9047-4 (2020-08-20)
Page 36
Garantia TÜR Garanti̇ Garanzia Záruka www.peerless-av.com/warranty Peerless-AV Peerless-AV Europe Peerless-AV América Latina 2300 White Oak Circle Unit 3 Watford Interchange, Av. de las Industrias 413 Aurora, IL 60502 Colonial Way, Watford, Herts, Parque Industrial Escobedo Email: tech@peerlessmounts.com WD24 4WP, United Kingdom General Escobedo N.L., México 66062...