Horizontal Venting Instructions - ECR UTICA BOILERS SVB II Series Installation, Operation & Maintenance Manual

Gas-fired hot water induced draft boilers
Table of Contents

Advertisement

Horizontal (Category III) venting systems must be installed
in accordance with these instructions.
Maximum Horizontal Vent Length For Stainless Steel Vent
Pipe - 30' Plus One 90º Elbow Plus Vent Terminal.
Minimum Horizontal Vent Length - 2' Plus One 90º Elbow
Vent Termination.
Additional elbows are equivalent to 6 feet of straight pipe
for 4" diameter 90° elbow or 3 feet of straight pipe for 3"
diameter 90° elbow. 2, 3, 4, 5, Section Boilers use 3" vent
pipe; for 6, 7 Section Boilers use 4" vent pipe.
Figure 8 - Induced Draft High Effi ciency Boilers
(21mm/m)

HORIZONTAL VENTING INSTRUCTIONS

INDUCED DRAFT HIGH EFFICIENCY BOILERS
(300mm
CHOICE OF VENT PIPE MATERIAL
• U. L. Listed Z-Flex Z-Vent Stainless Steel Vent Pipe.
• U. L. Listed Heat-Fab Saf-T-Vent Stainless Steel Vent
Pipe.
• U. L. Listed Flex-L Star-34 Stainless Steel Vent Pipe.
• U. L. Listed ProTech Systems FasNSeal Stainless Steel
Vent Pipe.
(21mm/m)
)
13
)
(300mm

Advertisement

Table of Contents
loading

Table of Contents