Download Print this page

Tripp Lite SmartOnline SU16KRT-1TF Owner's Manual page 9

16 & 20kva ups with n+1 configuration options

Advertisement

Available languages

Available languages

  • ENGLISH, page 1
Connection
Terminal Wiring Connections
SUPDMB20KHW
1
Unscrew the 2 screws to remove the Input and Output Terminal
Access covers.
2
Connect the 2 sets of N (L2), Ground and L (L1) wires (1 Input,
1 Output) according to markings on the connectors as seen in
the diagram below. Be sure to connect one set of wires to the
input terminals and the other set to the output terminals.
Parallel Connection
1
Being sure that all switches are off and all units are powered
down, connect the 2 parallel cables. Both will originate from
the parallel PDU with 1 connecting to the primary power
module and the other to the secondary power module. (Refer
to the diagram.)
Ensure that each of the parallel cables is securely
attached to the PDU and UPS by tightening the
thumbscrews on each connection.
2
Connect the input (SUPDMB20K, SUPDMB20KIEC
& SUPDMB20K8), and/or hardwired input/output
(SUPDMB20KHW) AC power connections located on the PDU.
The AC input cord attaches to the facility's AC source while the
AC output cord connects to the intended equipment.
1
2
ACC.SLOT
SW
ACC.SLOT
1
SW
INPUT
OUTPUT
2
SUPDMB20K, SUPDMB20KIEC,
SUPDMB20K8
9
N(L2)
GROUND
L(L1)
N(L2)
GROUND
L(L1)
INPUT
OUTPUT
SUPDMB20KHW

Advertisement

loading