INSTALLATION, OPERATION & MAINTENANCE MANUAL J & JX SERIES SIDE DISCHARGE Electric Submersible Pumps Single Phase 115 & 230V Three Phase 208V, 230V, 460V & 575V C AST IRON S INGLE PHASE T HREE PHASE J400 J15H J750 J22H J1500 J37H J1500H J55CH...
INTRODUCTION This Installation, Operation and Maintenance manual provides important information on safety and the proper inspection, disassembly, assembly and testing of the BJM Pumps® J & JX Series submersible pump. This manual also contains information to optimize performance and longevity of your BJM Pumps submersible pump.
SAFETY Pump installations are seldom identical. Each installation and application can vary due to many different factors. It is the owner/service mechanics responsibility to repair, service, and test to ensure that the pump integrity is not compromised according to this manual.
INSPECTION Review all safety information before servicing pump. The following are recommended installation practices/procedures for the pump. If there are questions in regards to your specific application, contact your local BJM Pumps distributor or BJM Pumps, LLC. PRE-INSTALLATION INSPECTION 1) Check the pump for damage that may have occurred during shipment.
Note: For EPDM seals propylene glycol is used in the seal chamber OIL FILL QUANTITY/TYPE Qty. oil in seal chamber Models U.S. fl. oz. C.C. Type of oil J400 ISO 32 NSF Food Mineral Grade J750 ISO 32 NSF Food Mineral Grade J1500 ISO 32 NSF Food Mineral Grade ISO 32 NSF Food Mineral Grade...
Proper lifting equipment (rope/chain) must be used. POSITIONING THE PUMP BJM Pumps, J & JX Series pumps are designed to operate fully or partially submerged. Do not run the pump dry. Refer to data sheet for minimum submersion depth for your particular model.
PUMP ROTATION Two ways to check the correct pump rotation: 1. By looking at the impeller; the rotation of the impeller should be counter clockwise as shown in the picture below. 2. By looking from the top of the pump. Since the impeller cannot be seen, the best way to check the rotation is to check the kick back motion of the pump when the pump just starts.
PUMP OPERATION This pump is designed to handle dirty water that contains some solids. It is not designed to pump volatile or flammable liquids. Do not attempt to pump any liquids which may damage the pump or endanger personnel as a result of pump failure.
Single phase pumps always use a three-prong grounded receptacle. It is recommended that a Ground Fault Interrupter (GFI) type receptacle (or equivalent) be used. STOPPING To stop the pump (manual and automatic mode), unplug it from the power source, turn off the breaker, or turn the power source off (generator).
Use with approved motor control that matches motor input in full load amperes. “UTILLISER UN DÉMARREAR APPROUVÉ CONVENANT AU COURANT Á PLEINE CHARGE DU MOTEUR.” BJM Pumps has been evaluated for use with water or water based solutions. Please contact the manufacturer for additional information.
SINGLE PHASE WIRING INSTRUCTIONS FOR YOUR PROTECTION, ALWAYS DISCONNECT PUMP FROM ITS POWER SOURCE BEFORE HANDLING. Single phase pumps are supplied with a three prong grounded plug to help protect you against the possibility of electrical shock. DO NOT UNDER ANY CIRCUMSTANCES REMOVE THE GROUND PIN. The three prong plug must be inserted into a mating three prong grounded receptacle.
“Risk of electrical shock” Do not remove power supply cord and strain relief or connect conduit directly to the pump. Installation and checking of electrical circuits and hardware should be performed by a qualified licensed electrician. To automatically operate a non-automatic three phase pump, a control panel is required.
Pump should be disconnected from the electric power supply before proceeding to do any service or maintenance. To service or repair your pump, please contact your local BJM Pumps distributor. Service should only be performed by a qualified electrician. MAINTAINING YOUR PUMP ...
Page 16
8) Remove the inspection screw for the oil 9) Remove the screws that hold the oil chamber (pos#50-08). Pour out a small chamber cover in place & remove the sample of the oil. If it is milky white, or oil. contains water, then the oil and 10) Replace the mechanical seal if possible, the mechanical seal, should...
BJM Pumps, LLC’s liability for any breach of this warranty shall be limited solely to replacement or repair, at the sole option of BJM Pumps, LLC, of any part or parts of the Product found to be defective during the warranty period, provided the Product is properly installed and is being used as originally intended.
START-UP REPORT FORM This form is designed to record the initial installation, and to serve as a guide for troubleshooting at a later date (if needed). BJM Pumps, LLC 123 Spencer Plain Road Old Saybrook, CT. 06475 Pump Owner’s Name...
Page 39
START-UP REPORT FORM presence? Are guide rails exactly vertical? Is base elbow installed level? Liquid level controls: Model control installed away from turbulence? Operation Check Tip lowest float (stop float), all pumps should remain off. Tip second float (and stop float), one pump comes on. Tip third float (and stop float), both pumps on (alarm on simplex).
Page 40
START-UP REPORT FORM Voltage supply at panel line connection, pump on L1-L2 L2-L3 L3-L1 Amperage load connection, pump on FINAL CHECK Is pump secured properly? Was pump checked for leaks? Do check valves operate properly? Flow: Does station appear to operate at proper rate? Noise level: Acceptable...