Download Print this page

Southbend G Series Owner's Manual page 18

Electric convection ovens
Hide thumbs Also See for G Series:

Advertisement

I
NSTALLATION
E
C
O
LECTRIC
ONVECTION
VENS
5. Route the supply wires and the grounding wire through the hole on the back of the oven. Use a strain-relief fitting.
6. Attach each supply wire to the appropriate terminal of the contactor (according to the wiring diagram).
7. Insert the ground wire into the grounding lug and tighten the screw.
8. Check that all connections match the wiring diagram and are tight.
9. Reattach the right-side panel and insulation; and the lower-front panel.
Step 7: Check the Installation
1. Check that all screws and bolts are tightened.
2. Move the oven into the position at which it will be operated.
3. Check that the oven is level. If not, adjust the legs.
4. Check that the appropriate clearances are satisfied (see page 7).
5. Turn-on supply power and check oven for proper operation.
PAGE
18
OF 48
OPERATOR'S MANUAL 1181958 REV 6 (11/15)

Hide quick links:

Advertisement

loading