Electrical Work - Mitsubishi Electric PAC-IF012B Technical Manual

Air to water (atw) heat pump, interface (i/f) and flow temp. controller (ftc)
Table of Contents

Advertisement

2. Electrical work

C
Photo.2-1
A
2.1.1. FTC unit power supplied from outdoor unit
The following connection patterns are available.
The outdoor unit must be powered properly. (Details are shown in its installation manual.)
A
B
C
FTC unit model
Wiring Wire No. × size (mm²)
Circuit rating
*1. Max. 80 m
*2. The fi gures are NOT always against the ground.
S3 terminal has DC 24 V against S2 terminal. However between S3 and S1, these terminals are not electrically insulated by the transformer or other device.
Notes: 1. Wiring size must comply with the applicable local and national codes.
2. Power supply cables and FTC unit/outdoor unit connecting cables shall not be lighter than polychloroprene
sheathed fl exible cable. (Design 60245 IEC 57)
3. Install an earth wire longer than other cables.
C
B
E
D
F
L
N
S1
S1
S2
S2
S3
S3
E
Photo. 2-2
FTC unit-Outdoor unit
FTC unit-Outdoor unit earth
FTC unit-Outdoor unit S1-S2
FTC unit-Outdoor unit S2-S3
2.1. FTC (Photo. 2-1)
1. Remove the cover.
2. Wire the power cable and control cable separately through the
respective wiring inlets given in the photo.
• Make sure to put screws tightly.
A Inlet for control cable
B Inlet for power
C Clamp
D FTC / Outdoor unit connecting terminals
E Earth terminal
D
A
Outdoor unit power supply
B
Earth leakage breaker
C
Wiring circuit breaker or isolating switch
D
Outdoor unit
E
FTC unit/outdoor unit connecting cables
F
FTC unit
TB6
L
Earth cable
58
S1
S2
S3
N
E: FTC unit/outdoor unit
connecting cables
PAC-IF021B-E
3× 1.5 (polar)
1 × Min. 1.5
AC 230 V
DC24 V

Advertisement

Table of Contents
loading

Table of Contents