Power Board Removal
Prerequisite:
Upper Cover Removal
1. Locate power board (B) on upper cover. Refer to
2. Remove screw (A) from upper cover (Figure 3-28).
Figure 3-28. Power Board Removal
3. Remove power board FFC (B) from opening in upper cover mylar (C).
Power Board Installation
1. Install power board FFC (B) to opening in upper cover mylar (C)
2. Install and secure screw (A) to upper cover.
3. Install upper cover.
M2.0x3.0
3-30
Size
Quantity
1
Figure
3-26.
A
B
(Figure
Screw Type
Machine Maintenance Procedures
0
C
0
3-28).