Power Switch Board Removal
Prerequisite:
Mainboard Removal
1. Find Power Switch Board (A) on Base Assembly. Refer to
2. Remove powerboard cable (B) from the cable guides
3. Remove one (1) screw (C) from base assembly
4. Remove power switch board (A) from Base Assembly.
B
A
Figure 3-26. Power Switch Board
Power Switch Board Installation
1. Put Power Switch Board (A) on Base Assembly. Refer to
2. Install and secure one (1) screw (C) to base assembly
3. Secure the powerboard cable (B) to the cable guides on base assembly
4. Install Mainboard.
ID
Size
C
M2.0*2.0
3-30
C
Quantity
1
Figure
3-26.
(Figure
3-26).
(Figure
3-26).
Figure
3-26.
(Figure
3-26).
Screw Type
Machine Maintenance Procedures
0
0
(Figure
3-26).