Installation And Switch On - Sagitter SG AQUPAR18 User Manual

Ip led projector rgbw
Table of Contents

Advertisement

Available languages

Available languages

4. - INSTALLATION AND SWITCH ON

4.1 - PRODUCT INSTALLATION
- Do not shake the device. Avoid the use of too much force during installation or unit fixing.
- The unit can be installed on the floor resting on the rubber feet, on the wall, ceiling or on a
truss.
the mounting of the safety rope (PLH232 – PLH248 sold
separately) in the case where the product is hung on a
placed in the floor, the safety cable is always required.
WARNING! IT'S REQUIRED
wall, ceiling or on a truss. Except when the device is
18

Advertisement

Table of Contents
loading

Table of Contents