WESTECH VS Series Instruction Manual page 40

Solar charge controller
Table of Contents

Advertisement

Discharging circuit is off
and
the
LOAD
monitoring interface shows
Short.
Charging and discharging
circuit is off and the
LOAD
of
monitoring
interface
shows
Short、Error.
Load short
of
Discharging
switching tube
is damaged.
MOS-I
times, push the key ENTER and controller
recover output after 10 seconds. In the
process of 5-time reactivation, if it is
recovered manually, the 5-time
reactivation will be circulated again.
When there is any change from night to
daytime, restart the self-recovery process.
Namely, 5-time circular reactivation can
be operated again.
Please check carefully loads connection
condition. It is reactivated after delayed 5
seconds for the first time, 10 seconds for
the second time, 15 seconds for the third
time, 20 seconds for the fourth time and
25 seconds for the fifth time. If over 5
times, push the key ENTER and controller
recover output after 10 seconds. In the
process of 5-time reactivation, if it is
recovered manually, the 5-time
reactivation will be circulated again.
When there is any change from night to
daytime, restart the self-recovery process.
Namely, 5-time circular reactivation can
be operated again.
Please restart controller, if the fault still
exists, immediately cut off charging and
discharging circuit and contact the
supplier to make maintenance.
37

Advertisement

Table of Contents
loading

Table of Contents