SEE FIGURE 3 – MOUNTING INSTRUCTIONS
SUPPLY AIR
OPENING
RETURN AIR
OPENING
CONCRETE BLOCK WALL INSTALLATION
MIS-549 B
FIGURE 5
WALL MOUNTING INSTRUCTIONS
WOOD FRAME WALL INSTALLATION
FIGURE 6
WALL MOUNTING INSTRUCTIONS
INTERIOR FINISHED WALL
OVER FRAME
EXTERIOR FINISH WALL
OVER FRAME
FRAMING MATERIAL
2 x 4'S, 2 x 6'S &/OR
STRUCTURAL STEEL
SUPPLY AIR
OPENING
RETURN AIR
OPENING
WOOD OR STEEL SIDING
ATTACH TO TOP
PLATE OF WALL
1.000" CLEARANCE
ALL AROUND DUCT
1.000" CLEARANCE
ALL AROUND DUCT
ATTACH TO BOTTOM
PLATE OF WALL
WALL STRUCTURE
FACTORY SUPPLIED
RAIN FLASHING.
MOUNT ON UNIT
BEFORE INSTALLATION
SUPPLY AIR
RETURN AIR
BOTTOM MOUNTING
BRACKET. MOUNT ON
WALL BEFORE
INSTALLING UNIT.
SIDE VIEW
SEE UNIT DIMENSIONS, FIGURE 2,
FOR ACTUAL DIMENSIONS.
E + 1.000
B
SUPPLY DUCT
OPENING
RETURN DUCT
OPENING
C
L
2 x 6
THIS STRUCTURAL MEMBER
LOCATED TO MATCH STUD
SPACING FOR REST OF WALL.
A SECOND MEMBER MAY BE
REQUIRED FOR SOME WALLS.
Manual 2100-586B
Page
DUCT
OPENING
MIS-548 A
1.000
A
I
C
K
11 of 25