Lp Vapor Installation (Typical) - Generac Power Systems EcoGen G0061030 Installation Manuallines

Hide thumbs Also See for EcoGen G0061030:
Table of Contents

Advertisement

Fuel Conversion/Gas Connections

LP Vapor Installation (typical)

A
NG BTU = ft
Megajoules = m
A.
BTU and Pressure Decal
B.
Check Distance with Gas Provider
C.
Primary Fuel Pressure Regulator Per LP Provider
D.
Manual Shutoff Valve
E.
Secondary Fuel Pressure Regulator
F.
Flexible Fuel Line
G.
Sediment Trap
H.
Accessory Valve with Manometer Port
Size fuel tank large enough to provide required BTUs for generator and ALL
I.
connected appliance loads. Be sure to correct for weather evaporation.
22
B
F
G
H
3
/h X 2500
3
/h X 93.15
Figure 5-7. LP Vapor Installation (typical)
B
D
E
Installation Guidelines for 60 Hz EcoGen™ Generator
C
I
000619b

Advertisement

Table of Contents
loading

Table of Contents