Installation Steps - GE -DSG-8 DSGH-5 User Manual

Table of Contents

Advertisement

Chapter 3: Application

Installation Steps

1. Unpack the Industrial Gigabit Ethernet Switch.
2. Check the DIN-Rail is screwed on the Industrial Gigabit Ethernet Switch. (Please
refer to DIN-Rail Mounting section for DIN-Rail installation. If the DIN-Rail is not
screwed on the Industrial Gigabit Ethernet Switch.). If you want to wall mount the
Industrial Gigabit Ethernet Switch, then please refer to Wall Mount Plate Mounting
section for wall mount plate installation.
3. To hang the Industrial Gigabit Ethernet Switch on the DIN-Rail track or wall, please
refer to the Mounting Installation section.
4. Power on the Industrial Gigabit Ethernet Switch. (Please refer to the Wiring the
Power Inputs section for power input) The power LED on the Industrial Gigabit
Ethernet Switch will light up. Please refer to the LED Indicators section for
meaning of LED lights.
5. Prepare the twisted-pair, straight through Category 5 cable for Ethernet
connection.
6. Insert one side of Category 5 cables into the Industrial Gigabit Ethernet Switch
Ethernet port (RJ-45 port) and another side of category 5 cables to the network
devices' Ethernet port (RJ-45 port), ex: Switch, PC or Server. The UTP port (RJ-45)
LED on the Industrial Gigabit Ethernet Switch will light up when the cable
connected with the network device. Please refer to the LED Indicators section for
LED light meaning.
Note:
Be sure the connected network devices support MDI/MDI-X. If it does not
support then use the crossover category 5 Cable.
7. When all connections are all set and LED lights all show normal, the installation is
complete.
14
All manuals and user guides at all-guides.com
GE-DSG-8 DSGH-5 and 8 Ethernet Switch User Manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ge-dsg-8 dsgh-8

Table of Contents