Page 1
BARK PARK WUF004 Crawl Through Installation Instructions...
Page 2
WUF004 Crawl Through Installation Procedure Check using the Parts List that none of the components are missing. Plan the final position of the Crawl Through ensuring there is sufficient space.* Sort and identify parts before assembly. All four posts are identical.
Page 4
WUF004 Crawl Through Fixings and Foundation Plan 1113mm TITLE REVISION DESCRIPTION DRAWN BY CHECKED SCALE DATE WUF014 TUNNEL DZS009 M10 STEP WASHER HSS514 M10 x 40 HEX SET SCREW DZS005 M10 BLACK NUT COVER Page 4...
Page 5
WUF004 Crawl Through Maintenance Instructions Recommended Regular Inspection and Maintenance Interval Days Check stability of structure, tighten connections if required. Check all uprights at ground level for corrosion and/or rot. Replace any defective parts. Check all painted elements for damage, rub down and repaint or replace as required.
Need help?
Do you have a question about the WUF004 and is the answer not in the manual?
Questions and answers