NEC MD212G3 Installation & Maintenance Manual page 12

Table of Contents

Advertisement

5. To keep the cables neatly organized, place them into the cable management system that is built into the stand.
Place the cables in the hooks fi rmly and evenly (Figure D).
6. Slide down the cable cover (Figure E).
7. Please check that you can still rotate, raise and lower the monitor screen, when you have installed the cables.
NOTE:
Handle with care when raising, lowering, rotating or tilting the monitor screen.
8. Connect one end of the power cord to the AC inlet on the back side of the monitor and the other end to the power outlet.
NOTE:
Please refer to the CAUTION section of this Installation & Maintenance Guide for proper selection of AC power cord.
9. Turn on the monitor with the front power switch (Figure F) and the computer.
NOTE:
If you have any problems, please refer to the Troubleshooting section of this Installation & Maintenance Guide.
Figure D
Figure E
Power switch
Figure F
English-9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Md211g5

Table of Contents