2.0.1 Before You Begin

This chapter explains how to install the CPU, CPU heatsink,
memory modules, and hard drives. Instructions on inserting a
PCI card are also given.
Take note of the precautions mentioned in this section when
installing your system.

2.0.2 Work Area

Make sure you have a stable, clean working environment.
Dust and dirt can get into components and cause malfunc-
tions. Use containers to keep small components separated.
Putting all small components in separate containers prevents
them from becoming lost. Adequate lighting and proper tools
can prevent you from accidentally damaging the internal
components.

2.0.3 Tools

The following procedures require only a few tools, including
the following:
Most of the electrical and mechanical connections can be dis-
connected using your fingers. It is recommended that you do
not use needle-nosed pliers to remove connectors as these
can damage the soft metal or plastic parts of the connectors.
Chapter 2: Setting Up
A cross head (Phillips) screwdriver
A grounding strap or an anti-static pad