COZY DVCF40 Installation And Operating Instructions Manual page 14

Direct vent counterflow wall furnace
Table of Contents

Advertisement

Available languages

Available languages

14-PEK: 14' PLUG EXTENSION KIT (For Non-Recessed Installations Only)
CAUTION: These kits must be installed by a qualified installer or service technician.
Units with Terminal Board
1.
Turn heater off following Section 3 in the Lighting Instructions
and allow to cool.
2.
Turn off all electricity to heater.
3.
Remove top louver assembly, fan shroud and fan blade.
4.
Loosen two screws on romex connector.
5.
Remove junction box cover plate.
6.
Disconnect three power cord terminals and pull power cord out of top of
heater.
7.
Insert power cord provided in kit through romex connector and plug onto
terminal board following wiring diagram found in lighting and operating
instructions.
8.
Tighten two screws on romex connector.
9.
Replace junction box cover plate.
10.
Replace fan blade, fan shroud and top louver assembly.
11.
Snap 90 degree outside corner (Ref. 1) onto 3 foot section (Ref. 2) plastic
raceway. Insert power cord and remove blue backing from adhesive strip
on raceway and apply to side of heater.
12.
Insert power cord into second 3-foot section of raceway (Ref. 3) and
remove blue backing and apply to side of heater, butting up against bottom
of other section.
13.
Cut 14-inch long bottom section to required length (see chart), insert
power cord, remove backing and apply to side of heater.
14.
Plug power cord into wall receptacle.
15.
Light the heater following lighting instructions.
MODEL NO.
LENGTH OF BOTTOM SECTION (Ref. 4) PLASTIC RACEWAY
DVCF40
5-5/16 Inches
DVCF55
14 Inches
1018028-B
NOTE: Lengths terminate approximately 2 inches above floor.
NOTE: Lengths terminate approximately 2 inches above floor.
Page 14
FIG. 11
90 DEGREE
OUTSIDE
CORNER
(1)
3 FT.
SECTION
(2)
3 FT.
SECTION
(3)
BOTTOM SECTION (4)

Advertisement

Chapters

Table of Contents
loading

Table of Contents