Installation Instructions (General) - Curtis IntelliFresh G4GEMXSIFT30x Instructions Manual

Offee brewing system with freshtrac satellite
Table of Contents

Advertisement

INSTALLATION INSTRUCTIONS
Installation
Leveling
WARNING: Use the leveling legs to level the
brewer only. Do not use them to adjust brewer
height. Do not extend them higher than
necessary.
1
Position the brewer on the counter top. Level it left to
right and front to back by turning the bottom of the
legs.
Connect the Water Supply
2
Flush the water supply line prior to installation to
3
the back of the brewer. Leave the water supply valve
closed until the power is connected.
Setting Up 120/220 Volt Units for 220-240 Volt
WARNING: Do not connect the power cord to
the power supply until instructed to do so.
Operation
4
Remove the front cover.
5
Loosen the strain relief on the back of the brewer.
6
Disconnect the existing power cable from the terminal
block and remove.
relief, into the brewer. The brewer may be wired for
connection directly to a junction box or for use with
a power plug that connects to an electrical outlet
meeting the brewer SPECIFICATIONS.
8
Disconnect and cap the jumper wire between the "C"
and "N" terminals on the terminal block.
9
Connect the wires on the power cable to the
terminal block inside the brewer according to the
ELECTRICAL SCHEMATIC.
Tighten the strain relief and replace the front cover.
Front
Brew
panel
deck
label
II14
block
or
block
D

Advertisement

Table of Contents
loading

Table of Contents