AC grid wiring is connected through the inverter switchbox.
•
Run an approved raceway between inverter and external AC disconnect switch.
•
Make conduit entry through openings (B or E) shown in table 3-1.
•
Connect AC wiring to switch box terminal block (J) and the main AC ground cable to switchbox terminal
block (K).
L
MPPT
MPPT
1
2
The grid standard table below shows AC wiring connections according to the AC grid type.
•
Connect wiring to the numbered terminals as shown in the table .
•
Size conductors per NEC Article 310; use only 75°C or 90°C. copper wire.
•
Terminal block accommodates conductor type shown and wire size range per table 3 2.
•
If several inverters are installed to a three-phase AC GRID, always distribute the inverters between the
phases in order to reduce power imbalance between the phases.
•
Always refer to the local standards.