SENDER TEST
❹
Verify operation before permanently sticking the sender to the tank.
SeeLeveL Sender Installation Manual 710-JS / 710-ES / 710-SS
.
Tank levels operation test
For the initial test, have the tank at least 1/4 full of
water or sewage.
Verify that the percent level reading on the display
panel looks correct.
FRESH
LEVEL IN PERCENT
.
Signal strength test
The signal power is an indication of how much
signal is being transmitted through the tank wall
and picked up by the receiver part of the sender.
Typical signal power should be 50% to 60%. The
gauge will work with minimum signal strength as
low as 20%, but it is good to have at least 50% to
60% at installation so that there is some margin
available for buildup in the tank. P00 = 100%.
2 5
Page 10