BELT DRIVE AIR HANDLERS New Release INSTALLATION OPERATION & MAINTENANCE 115.22-NOM5 (704) MODELS: YSHW, YSHX AIRFLOW AIRFLOW (RIGHT HAND UNIT SHOWN) ATTENTION: READ THIS MANUAL AND ALL LABELS ATTACHED TO THE UNIT CAREFULLY BEFORE ATTEMPTING TO INSTALL, OPERATE OR SERVICE THESE UNITS! CHECK UNIT DATA PLATE FOR ELECTRICAL SPECIFICATIONS AND MAKE CERTAIN THAT THEY AGREE WITH THOSE AT POINT OF INSTALLATION.
Suffi cient clearance must be provided on the side of UNIT ELEVATION the blower coil to allow access to electrical controls Mounting holes are provided by York for the conve- and to service the motor blower assembly. nience of the installer (see Figure 2). Threaded Rod Standard unit confi...
fi eld wiring (see Figure 3 for On 7-1/2 to 20 ton horizontal units, the YSHW blower typical factory and fi eld wiring). coil units are intended to be mounted thru the top of A 4 x 4 electrical box is provided on the cabinet for the unit.
PIPING • Use wet cotton rags to cool valve bodies, if present, YSHW units employ a hydronic coil designed for use when soldering. with either hot or chilled water. Each coil has a 1/4 • Open all valves (mid-way for hand valves, manually inch bleed line.
20 X 20 (2) 1/2 ODS. 7/8 ODS. Note: The 3.50” dimension locates the 7/8” knock outs for mounting rods. AIR FLOW 3.50 3.50 2.00 1.00 AIR FLOW FIG 4 - DIMENSIONS FOR 2 - 5 TON UNITS YORK INTERNATIONAL...
Page 6
37-1/2 X 20 (3) 5/8 ODS. 1-1/8 ODS. 240YSHX4 62-1/2 16-3/8 44-3/4 50-1/4 50 X 20 (3) 5/8 ODS. 1-1/8 ODS. AIRFLOW 3.50 3.50 3.50 2.00 3.50 1.00 AIR FLOW FIG 5 - DIMENSIONS FOR 7-1/2 - 20 TON UNITS YORK INTERNATIONAL...
DRAIN PAN The drain pan should be clean to allow proper conden- sate fl ow. Remove any accumulation of residue from the drain pan and inspect for rust and leaks. FIG 6 - PULLEY ALIGNMENT AND BELT ADJUSTMENT YORK INTERNATIONAL...