Controls - Ossila Solar Cell I-V Test System User Manual

Test system
Hide thumbs Also See for Solar Cell I-V Test System:
Table of Contents

Advertisement

Solar Cell I-V Test System (Manual)
9.9

Controls

(I) Measure
Clicking this button will start the measurement using the chosen settings.
This button cannot be clicked if the software has not detected the test system.
(II) Abort
Stops a measurement that is currently in progress.
Ossila.com
Figure 9.12. Characterisation save data format.
Figure 9.13. Stabilised Current Output save data format.
Figure 9.14. Solar Lifetime Measurement save data.
Figure 9.15. Controls for the measurements.
22
User Manual
Ossila Limited © 2022

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Solar Cell I-V Test System and is the answer not in the manual?

This manual is also suitable for:

T2002

Table of Contents