Probe-Electrode Positioning; Gas Feeding Line - Riello 40 FS10 Installation, Use And Maintenance Instructions

Forced draught gas burner
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 45
3.2 PROBE - ELECTRODE POSITIONING
~
Probe
D5104

3.3 GAS FEEDING LINE

1
1 – Gas supply pipe
2 – Manual cock (supplied by the installer)
3 – Gas pressure gauge (supplied by the installer)
4 – Filter
5 – Gas pressure switch
6 – Safety valve
7 – Pressure governor
8 – Adjustment valve
GAS TRAIN ACCORDING TO EN 676
GAS TRAIN
TYPE
MBDLE 405 B01
MBDLE 407 B01
The gas train is supplied separately, for its adjustment see the enclosed instructions.
2736
40
mm
2
3
M1
CODE
INLET
Rp 3/4
3970500
3970531
Rp 3/4
Ignition electrode
Diffuser
2
WARNING
4
5
6
Gas-supply pressure test point
M1 –
M2 – Pressure coupling test point
CONNECTIONS
OUTLET
Rp 3/4
Rp 3/4
4
GB
Ionization probe
2.2
3
mm
7
8
M2
USE
Natural gas  80 kW and LPG
Natural gas and LPG
Electrode
=
D5069

Advertisement

Table of Contents
loading

This manual is also suitable for:

564t303756435Fs 10

Table of Contents