Download Print this page

Bison BA8350 Installation And Use Manual page 10

Zip crank basketball systems
Hide thumbs Also See for BA8350:

Advertisement

33.
Attach Height Gauge (BB) to the top Extension Channel (C) with one 1/4" x 1" Hex Bolt (EE) and 1/4"
Flange Nut (DD) in the back mounting hole. Slide the Pointer (CC) onto one 1/4" x 1" Hex Bolt (EE)
then install one 1/4" Flange Nut (DD) against the Pointer (CC) with just enough slack to let the
Pointer (CC) rotate freely on the 1/4" x 1" Hex Bolt (EE). Pass this assembly through the mounting
holes in the Extension Channel (C) and tighten with the remaining 1/4" Flange Nut (DD). You must
tighten the 1/4" Flange Nuts (DD) against each other to lock this assembly in place, if you tighten the
1/4" x 1" Hex Bolt (EE) you will also tighten the assembly against the Pointer (CC). The Pointer (CC)
must rotate freely on the 1/4" x 1" Hex Bolt (EE) once installed to accurately indicate your rim height.
The Height Gauge (BB) can be adjusted by loosening the 1/4" x 1" Hex Bolts (EE) to align the
Pointer (CC) with the 10' mark when Rim (Z) measures 10' from the playing surface. See Figure 13.
34.
Install the Pole Cap (AA), the Net (Z) and the Pole Padding (HH) if applicable.
35.
You are now ready for play.
Crank Handle (FF) must be removed and stored before playing. The crank handle will be
Figure 13
Warning!
a safety hazard to the playing area.
10

Advertisement

loading