HYBRID MODULE
Preliminary installation
The HYBRID MODULE HYBRID MODULE must be posi-
tioned close to a residential space to ensure best perfor-
mance. To position the system, use the template provided
and a spirit level.
NOTE: You are advised to first install the hybrid module,
and subsequently the boiler.
Affix the module to the wall using the accessories sup-
plied.
Minimum installation distances
To allow proper system maintenance, you must adhere to
the minimum installation distances shown in the figures
below.
(Fig. 1)
50
1. Removing the front panel
Remove the two screws A. Push the front frame first up-
wards, and then forwards (fig.2).
(Fig. 2)
A
2
72 /
50
500
1
A
2. Connection to the boiler
Connect the system delivery and return, cold water and
domestic hot water, and gas, pipes of the Hybrid Module
to the corresponding boiler connections, as shown in the
figure.
Connect the 1" taps, 3/4" gas tap, 1/2" tap and 1/2" fitting to
the corresponding hybrid module connections as shown.
ATTENTION:
install the internal unit in a place compatible with the specified
environmental conditions.
Minimum use temperature 0°C.