Westinghouse 9K/12K Use And Installation Instructions page 12

Hide thumbs Also See for 9K/12K:
Table of Contents

Advertisement

Available languages

Available languages

Installation instructions
Wires connect steps
9K~24K
(1) Wiring distribution cover removal
Unscrew the mounting screws to remove the wiring distribution cover.
(2) Fasten the power supply cable and the transmitting cable to the conduit holder using the lock nut.
(3) Connect the power supply cable and the transmitting cable to terminal.
(4) Fasten the power supply cable and the transmitting cable with the cable clamp.
(5) Be sure to seal conduit openings.
Place the cables side to side. (Do not overlap the cables.)
(6) Put the wiring distribution cover back after completion of the work.
Right side plate
distribution
9K~18K
36K
(1) Remove the screws, maintenance plate and the valve cover.
(2) Pass transmitting cable and power supply through the two holes on the right side plate.
(3) Fasten the conduit connection to the right side plate using the lock nut.
(4) Connect the transmitting cable and power supply to the terminal.
(5) Tie the transmitting cable and power supply with the clamp tightly.
(6) After completing the wiring, seal the conduit opening with the
(7) Put the maintenance plate and the valve cover after completion of the work.
Lock nut
Valve cover
Maintenance plate
Wiring
Lock nut
cover
Transmitting
cable
Right side plate
Hole
Conduit connector
Conduit plate
Power supply
Conduit
connector
putty
Right side plate
Transmitting cable
Power supply
Lock nut(Qty:2)
Conduit connector for
transmitting cable
Conduit connector for power supply
10
Lock nut
Conduit plate
Conduit
connector
24K
.
Maintenance
plate
Power supply
Transmitting
cable
Valve cover

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

18k24k/36k

Table of Contents