Installation instructions
(6) After finishing connecting the refrigerant pipes, insulate with
proper insulation.
·For outside unit, insulate both pipes.
·Cover piping joints with pipe cover.
·Using piping tape, apply taping starting from the entry of outdoor unit.
- Fix the end of piping tape with adhesive tape.
- When piping has to be arranged through above ceiling, closet
or area where temperature and humidity are high, install
additional sold insulation for prevention of condensation.
5. Air tight test
·Air tight check - Pressure test with nitrogen.
Connect the gauge manifold using charging hoses with a nitrogen
cylinder to the check joints of the liquid line and the gas line stop
valves.
Perform pressure test.
Don't open the gas line stop valves.
Apply nitrogen gas pressure of 550 psig (3.8 MPa).
Check for any gas leakage at the flare nut connections, or brazed
parts by gas leak detector or foaming agent.
Gas pressure doesn't decrease, which is OK.
After the air tight test, release nitrogen gas.
6. Vacuum pumping and charge refrigerant
·Vacuum pumping
(1) Remove the service port cap of the stop valve on the gas pipe
side of the outdoor unit.
(2) Connect the manifold gauge and vacuum pump to the service port
of the stop valve on the gas pipe side of the outdoor unit.
(3) Run the vacuum pump. (Work for more than 15 minutes.)
(4) Check the vacuum with the gauge manifold valve, then close the
gauge manifold valve and stop the vacuum pump.
(5) Leave it as is for one or two minutes. Make sure that the pointer of
the manifold gauge remains in the same position. Confirm that the
pressure gauge shows -14.7psig (-0.101MPa or -760mmHg).
(6) Remove the manifold gauge quickly from the service port of the
stop valve.
(7) After refrigerant pipes are connected and evacuated, fully open
all stop valves on both sides of gas pipe and liquid pipe.
(8) Open adjusted valve to add refrigerant (the refrigerant is liquid).
(9) Tighten the cap to the service port .
(10) Retighten the cap.
(11) Leak test foam with halogen leak detector to check the flare nut
and brazing for leaks. Use foam that does not generate
ammonia (NH3) in the reaction.
·An excess or a shortage of refrigerant is the main cause of trouble to the unit. Charge the correct quantity of
refrigerant according to the description in the manual.
·Check for refrigerant leaks. If a large refrigerant leakage occurs, it will cause difficulty in breathing or
harmful gases would occur if there is an open flame in the room.
CAUTION
8
Clamp (field-supplied) Insulation (field-supplied)
Piping insulation procedure
Procedure
Completion
Applying
of Ref.
Nitrogen
Piping
Gas
Repairing
of Leakage
Part
Air tight procedure
Indoor unit
Outdoor unit
Pressure
gauge
Manifold
valve
Vacuum
pump
Refrigerant pipe
(field-supplied)
Insulation
(
field-supplied
)
Check of
Pressure
Pass
Decrease
Charge hose
(for R410A)

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

18k24k/36k

Table of Contents