Download Print this page

HermanMiller Canvas Office Landscape Manual page 6

Interior full height & coh connector cover installation and disassembly for recycling instructions

Advertisement

4
Two-sided COH Connector Cover
Top Cap Cover
B
1. Install tiles on frames.
2. Install COH Trim Block Clips (G) on
Trim Block (E) only on the sides
where frame top caps will mate.
3. Install COH 2-sided Trim Block (E)
with clips on wire channel.
4. Slide Lower Frame Top Caps over
Trim Blocks Clips (G). Frame Top
Caps must be snapped to wire
channel and slid over (G).
5. Slide 2-sided Connector Cover (B)
over Trim Block (E) and Connector
Tube (22" only).
Z
© 2017 Herman Miller, Inc. Zeeland, Michigan. Printed in the U.S.A.
® Y, Z and Canvas Office Landscape are among the registered trademarks of Herman Miller, Inc.
Illustrations and specifications are based on the latest product information available at the time of publication.
The right is reserved to make changes in design and specifications at any time, without notice, and also to discontinue products.
G
Connector Tube
Note: Depending on frame heights, connector
blocks may or may not be present.
Connector Top Cap
B
Top Cap
Tiles
6. Insert Connector Top Cap into Frame
Top Caps.
7. Attach Top Caps to Frames making sure
the Connector Top Cap fits into
Connector Cover (B).
E
B
G
Tiles
Part no. 1b2hhp rev J.
6

Advertisement

loading