Download Print this page

HermanMiller Canvas Office Landscape Manual page 4

Interior full height & coh connector cover installation and disassembly for recycling instructions

Advertisement

2
Two-sided Full Height Connector Cover
1. Install tiles on frames.
(graphics shown without tiles for clarity)
2. Locate slots, flanges and paint notches in
Two-sided Full Height Connector Cover (J).
3. Install Two-Sided Full Height Connector
Cover (J) by placing slots over Connector
Blocks and sliding downward making sure
that flanges engage in notches on
Connector Tubes & paint notches are on
top of part.
J
Slot
Z
© 2017 Herman Miller, Inc. Zeeland, Michigan. Printed in the U.S.A.
® Y, Z and Canvas Office Landscape are among the registered trademarks of Herman Miller, Inc.
Illustrations and specifications are based on the latest product information available at the time of publication.
The right is reserved to make changes in design and specifications at any time, without notice, and also to discontinue products.
Notches
Connector Tube
J
Slots
Top View Fully Engaged
Connector Cover
Paint Notches
Flanges
Part no. 1b2hhp rev J.
4

Advertisement

loading