Samsung UN55D6000 E-Manual page 80

Samsung led television user manual
Hide thumbs Also See for UN55D6000:
Table of Contents

Advertisement

9. When done entering the
10. Press the down arrow key to go to the
ENTERE.
11. Repeat the same entry process for
12. When done, select
The network test screen appears and the verification process starts. When the
connection has been verified, the "Internet connection successful." message
appears.
Address, press ENTERE.
IP
Subnet Mask,
at the bottom of the page, and then press ENTERE.
OK
English
Subnet Mask
fields, and then press
Gateway, and
DNS
Server.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents