IBM Brocade Installation And User Manual page 58

2-port 10gbe converged network adapter for bladecenter
Table of Contents

Advertisement

B
Procedures
2. Select a port that you want to configure.
3. Select one of the following:
46
Under the Ad No column, 1/0 and 1/1 are the first port and second port respectively on the
first installed adapter while 2/0 and 2/1 are the first and second port on the second installed
adapter.
A maximum of 8 ports can display on a screen. Select Page Up to go to a previous screen or
Page Down to go to the next screen.
A screen similar to the following displays. (In the following example, port 0 on the Brocade
1020 adapter was selected.)
Adapter Settings. Use the Adapter Settings screen to enable BIOS, port speed (HBAs only),
and auto discovery of boot LUN information on the fabric. You can determine adapter
WWWN and PWWN. Proceed to
Brocade 2-Port 10GbE Converged Network Adapter for IBM BladeCenter Installation and User's Guide
step
4.

Advertisement

Table of Contents
loading

Table of Contents