Siemens 3TK28 Manual page 191

Table of Contents

Advertisement

Procedure for spring-loaded terminal blocks
Step
Operating instruction
1
To release the terminal spring, insert the 3-mm
flat-head screwdriver into the square opening
of the spring-loaded terminal until it engages.
Please observe a 10° horizontal angular
deviation of the screwdriver to the oval
opening.
2
Insert the cable into the oval opening as far as
it will go.
3
Hold the cable in the spring-loaded terminal.
4
Remove the screwdriver.
5
Pull on the cable to ensure it is tight.
See also
Connecting terminal blocks (Page 39)
3TK28 safety relays
Manual, 07/2016, NEB926157502000/RS-AB/003
Connection
5.2 Connecting terminal blocks
Figure
191

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents