Commissioning Check List - Rinnai HD70e Installation And User Manual

Continuous flow water heater
Hide thumbs Also See for HD70e:
Table of Contents

Advertisement

COMMISSIONING CHECK LIST

For full details - Refer to Installation Instructions
Attention Installer - have you checked:
Gas supply pipe is purged of foreign matter before connection.
For Hot and Cold cross connections i.e. Capped breaches/shower mixers,
taps closed and reversed 'Flick Mixer' connections?
That isolating valves are not connected directly to
the appliance and there is means of disconnection
after the isolating valve?
Have you cleaned cold water inlet filter?
That plumbing connections are correct?
Is appliance inlet gas pressure correct with all appliances operating?
Do the Master Controllers (if fitted) operate correctly?
Have you checked water temperature at all outlets?
Have you shown the customer how to operate the Temperature Controllers?
(If fitted)
Have you explained to the customer the minimum flow rate required to operate
the unit?
Have you explained to the Customer the Benefits of Controllers (If not fitted)
and that they can be added later?
39

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Infinity 32eInfinity 26eInfinity hd50e

Table of Contents