Gas Pressure Setting; Wiring Diagram; Commissioning Check List; Installation Record - Rinnai REU-AM2626WDL Operation & Installation Manual

Continuous flow water heater
Table of Contents

Advertisement

GAS PRESSURE SETTING

The regulator is electronically controlled and factory pre-set� Under normal circumstances it DOES NOT require
adjustment during installation� Make adjustments ONLY if the unit is not operating correctly and all other possible
causes for incorrect operation have been eliminated� Instructions for gas pressure setting are located in the
instruction pocket inside the appliance front cover�
For all injector size and gas pressure values refer to the appliance data plate, located on the left
hand side of the water heater�
NOTE

WIRING DIAGRAM

The wiring diagram is located in the instruction pocket inside the appliance front cover�

COMMISSIONING CHECK LIST

A commissioning check list is provided on the appliance front cover to enable the installer to step through the
correct commissioning procedure when installing a Rinnai Continuous Flow water heater�
The check list can also assist the installer to identify potential installation errors that may prevent the appliance
from operating correctly�

INSTALLATION RECORD

The Installation Record is a reference for the end user, help line staff and service technicians� Ensuring that this
information is available here will be helpful in the event that a service enquiry is required.

Installer Details

Installation Company Name:
Telephone / Mobile Phone:
Certificate of Compliance / Certification No.:
Authorised Persons - Licence No�:

System Details

Water Heater - Model Number *: REU-
Water Heater - Serial Number *:
* This information will need to be copied from the data plate, located on the left hand side of appliance.
Rinnai
Address:
Email:
Installers Name:
Installers Signature:
Installation Date:
Installation Address:
/
25
COMMISSIONING
HW_CF OIM

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents