Gas Pressure Setting; Wiring Diagram; Commissioning Check List; Installation Record - Rinnai Infinity 26 Operation & Installation Manual

Gas continuous flow water heater
Table of Contents

Advertisement

GAS PRESSURE SETTING

The regulator is electronically controlled and factory pre-set. Under normal circumstances it DOES NOT require
adjustment during installation. Make adjustments ONLY if the unit is not operating correctly and all other possible
causes for incorrect operation have been eliminated. Instructions for gas pressure setting are located in the
instruction pocket inside the appliance front cover.
For all injector size and gas pressure values refer to the appliance data plate, located on the left
hand side of the water heater.
NOTE

WIRING DIAGRAM

The wiring diagram is located in the instruction pocket inside the appliance front cover.

COMMISSIONING CHECK LIST

A commissioning check list is provided on the appliance front cover to enable the installer to step through the
correct commissioning procedure when installing a Rinnai gas continuous flow water heater.
The check list can also assist the installer to identify potential installation errors that may prevent the appliance
from operating correctly.

INSTALLATION RECORD

The Installation Record is a reference for the end user, help line staff and service technicians. Ensuring that this
information is available here will be helpful in the event that a service enquiry is required.
Installer Details
Installation Company Name:
Telephone / Mobile Phone:
Certificate of Compliance / Certification No.:
Authorised Persons - Licence No.:
System Details
Water Heater - Model Number *: REU-
Water Heater - Serial Number *:
* This information will need to be copied from the data plate, located on the left hand side of appliance.
Rinnai
Address:
Email:
Installers Name:
Installers Signature:
Installation Date:
Installation Address:
/
31
COMMISSIONING
HW_CF OIM

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents