Download Print this page
Knight Team Table Assembly Manual

Knight Team Table Assembly Manual

Advertisement

Quick Links

Team Table
Assembly Guide
Tools Required:
Powered Screwdriver, 4mm and 6mm Allen Key.

Advertisement

loading
Need help?

Need help?

Do you have a question about the Team Table and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Knight Team Table

  • Page 1 Team Table Assembly Guide Tools Required: Powered Screwdriver, 4mm and 6mm Allen Key.
  • Page 2 Team Table Page 1 Assembly Guide COMPONENTS IMPORTANT NOTES! Leg x6 Prior to installment, use or maintenance of the desk Adjustable Foot x6 frame, any installer and any user of the desk must study Leg Cable Cover x6 this assembly and operation manual carefully, so as to Rail Lengths x4 gain a complete understanding of its content.
  • Page 3 Team Table Page 2 Assembly Guide Step 1 Step 2 Slide the 2 way and 3 way connectors over each leg, and Loosely connect the M8x20mm dome head bolt and slot nut securely lock into place using M8x20mm cap head bolts.
  • Page 4 Team Table Page 3 Assembly Guide Step 5 Step 6 Ensure the worksurface is centered over the frame. Pre-drill Conceal any power box cables using the magnetic leg cable holes in the worksurface. Fully tighten all 10Gx20mm self covers. tapping screws through each leg and rail spacer bracket into the worksurface.