Download Print this page
RITE-HITE VBR-600 Dok-Lok Installation Manual
RITE-HITE VBR-600 Dok-Lok Installation Manual

RITE-HITE VBR-600 Dok-Lok Installation Manual

Vehicle restraint
Hide thumbs Also See for VBR-600 Dok-Lok:

Advertisement

Quick Links

This Manual Covers Restraints Built After Serial Numbers:
VB6001000 and up
PRINTED IN U.S.A.
RITE-HITE
PRINT SHOP
VBR-600 Dok-Lok
Vehicle Restraint
Installation Manual
®
MADE IN U.S.A.
PUBLICATION NO. 1327
JANUARY 2014

Advertisement

loading
Need help?

Need help?

Do you have a question about the VBR-600 Dok-Lok and is the answer not in the manual?

Questions and answers

Summary of Contents for RITE-HITE VBR-600 Dok-Lok

  • Page 1 VBR-600 Dok-Lok ® Vehicle Restraint Installation Manual MADE IN U.S.A. This Manual Covers Restraints Built After Serial Numbers: VB6001000 and up PRINTED IN U.S.A. PUBLICATION NO. 1327 RITE-HITE PRINT SHOP JANUARY 2014...
  • Page 2 RITE-HITE ® VBR-600 DOK-LOK ® Installation Manual NOTES Pub. No. 1327 — January 2014...
  • Page 3 Rite-Hite representative. The VBR-600 DOK-LOK vehicle restraint by Rite-Hite is intended to provide a safer workplace for workers in shipping and receiving dock areas. The VBR-600 DOK-LOK vehicle restraint is a hydraulic restraint device that, when properly installed and operated, retains a secure connection between the truck and dock.
  • Page 4 Rite-Hite Corporation does not recommend any particular lockout device, but recommends the utilization of an OSHA approved device (refer to OSHA regulation 1910.147). Rite-Hite Corporation also recommends the review and implementation of an entire safety program for the Control of Hazardous Energy (Lockout/Tagout).
  • Page 5 RITE-HITE ® VBR-600 DOK-LOK ® Installation Manual INSTALLATION INSTALLATION INSTRUCTIONS (No Hydraulic Leveler Present in Pit) Shim from top of cylinder support Dock Leveler to underside of Cylinder Clevis This Bolt May Need cylinder clevis To Be Removed To 1" Approx.
  • Page 6 RITE-HITE ® VBR-600 DOK-LOK ® Installation Manual INSTALLATION CONT. 4 x 4 x 3 NEMA 4 (Waterproof) Juction Box (Supplied By Others) Alternate Hose Routing Shown Prefered Hose Routing Main Cylinder Behind Cylinder Support #6 Hose Wire Tie Hoses These Locations...
  • Page 7 RITE-HITE ® VBR-600 DOK-LOK ® Installation Manual INSTALLATION CONT. disconnect (supplied by others) place control box where best suited within arms inside sign reach at eye level near door opening 5" Ref. inside light & control box 15" outside lights...
  • Page 8 RITE-HITE ® VBR-600 DOK-LOK ® Installation Manual INSTALLATION CONT. b. Seal the conduit in any location where the conduit transitions temperature zones that may produce condensation. c. Spacers should be installed between the • The control box and all wiring should be...
  • Page 9 RITE-HITE ® VBR-600 DOK-LOK ® Installation Manual WIRING DIAGRAM - STAND ALONE POWER UNIT DETAIL - "A" OUTSIDE LIGHT BOX (SUPPLIED BY RITE HITE) WHITE WIRE WIRES GREEN TO POWER SOURCE 30 AMP RATED WHITE WIRE FUSED DISCONNECT SIDE VIEW OF COVER...
  • Page 10 RITE-HITE ® VBR-600 DOK-LOK ® Installation Manual ELECTRICAL SCHEMATIC - STAND ALONE POWER UNIT To Customer Power Supply (1) MCom 120v, 1PH, 60Hz, 30 Amp. Fused Disconnect With 15 Amp. Motor - .75 H.P. Dual Element Time Delay Fusing 115v. 1Ph. 50/60 Hz.
  • Page 11 RITE-HITE ® VBR-600 DOK-LOK ® Installation Manual WIRING DIAGRAM - COMBO POWER UNIT DETAIL - "A" OUTSIDE LIGHT BOX (SUPPLIED BY RITE HITE) WHITE WIRE WIRES GREEN TO POWER SOURCE 30 AMP RATED WHITE WIRE FUSED DISCONNECT SIDE VIEW OF COVER...
  • Page 12 RITE-HITE ® VBR-600 DOK-LOK ® Installation Manual ELECTRICAL SCHEMATIC - COMBO POWER UNIT FROM 120V CONTROL VOLTAGE Solenoid 3 Divert FIXED TIMER (11) Sol3 (BLK) (WHT) 3X1(RD) DELAY ON BREAK 120 VAC, 0.23 AMPS Solenoid 4 INITIATE Lip Block 16FU1...
  • Page 13 RITE-HITE ® VBR-600 DOK-LOK ® Installation Manual HYDRAULIC SCHEMATIC Locking Cylinder Positioning Cylinder (Main) (Position) Shuttle Solinoid Valve Check Valve Valve (SOL2 - Position Cylinder Float) Solinoid Valve (Tank) (SOL1 - Position Cylinder Extend) System Relief 500 PSI (Ramp Out)
  • Page 14 RITE-HITE ® VBR-600 DOK-LOK ® Installation Manual VALVE BLOCK ASSEMBLY Return To NOTE: COMBINATION VALVE BLOCK SHOWN Tank Port Leveler Ramp Leveler Lip Block Cylinder Divert Solenoid (SOL 4) Solenoid Leveler Ramp (SOL 3) DOK-LOK Cylinder Out Port Position Cylinder...
  • Page 15 RITE-HITE ® VBR-600 DOK-LOK ® Installation Manual NOTES Pub. No. 1327 — January 2014...
  • Page 16 Rite-Hite in writing. In the event of any defects covered by this warranty, Rite-Hite will remedy such defects by repairing or replacing any defective equipment or parts, bearing all the costs for parts, labor, and transportation. This shall be the exclusive remedy for all claims whether based on contract, negligence, or strict liability.