Load Pump With Grease; Models Without A Follower Plate - Graco G5-G-24PR-4L0L05-00C00000 Manual

Automatic lubrication pump
Table of Contents

Advertisement

Use these volume adjustments as a starting point,
then adjust as needed to ensure the desired
lubrication dispense.

Load Pump with Grease

To ensure optimal performance from the G5 pump:
Use only NLGI #000 - #2 greases appropriate for
the application, automatic dispensing, and the
temperature. Consult with the machine and lube
manufacturer for details.
The reservoir can be filled using a hand operated
pump, a pneumatic pump, or an electric transfer
pump.
Do not overfill the reservoir.
Do not operate the G5 pump without a reservoir
attached.
NOTICE
Always clean the fitting (D) (F
dry cloth prior to filling the reservoir. Dirt and/or
debris can damage the pump and/or the lubrica-
tion system.
When changing greases, always use compatible
fluids or greases.
Use care when filling the reservoir with a pneu-
matic or an electric transfer pump, to not pressur-
ize and break the reservoir.
3A8848A
. 12) with a clean
IG

Models Without a Follower Plate

1. Connect the fill hose to the Zerk inlet fill fitting
(F
. 12)
IG
D
F
. 12
IG
2. For higher viscosity fluids, start the pump to rotate
the stirring paddle during the fill to prevent air
pockets from forming. Do not exceed a 30 minute
run time.
For models using an external controller, start the
pump operation following your controller
specifications.
3. Fill the reservoir with NLGI grease.
NOTE: The vent port located in rear of reservoir should
not be used as an overfill port/indicator (F
4. Remove the fill hose.
Operation
. 15).
IG
19

Advertisement

Table of Contents
loading

Table of Contents