Setup; Connecting; Verification - Arrow verical CYPRESS S6SBP201A1AVA1001 Operation Manual

Automotive pmic evaluation kit
Table of Contents

Advertisement

4.

Setup

4.1

Connecting

1. Connect the board to the power supply, load equipment and voltage meter as below.
+12V Power
Supply
4.2

Verification

1. Connect ENA pin to PGND1f, then, turn on +12V power supply.
2. Connect ENA pin to VBATf, then, DC/DC converter will start output.
3. Check that VOUTf is the same as the 'Output Voltage' of Figure 2-1 Evaluation Board Specification.
S6SBP20xAxxVA1001 Operation Manual, Doc. No. 002-08763 Rev. *A
Error! Use the Home tab to apply 見出し 1 to the text that you want to appear here.
Figure 2 Connecting the Board and Some Equipment
-
+
-
Voltage
Meter
+
-
Load
+
9

Advertisement

Table of Contents
loading

Table of Contents