Gree GWH07QA-K6DNC4A Service Manual page 166

Table of Contents

Advertisement

Step
10. Remove Electric Box Assy
Remove screws fixing the electric box subassembly;
loosen the wire bundle and unplug the wiring terminals.
Then lift the electric box to remove it.
11. Remove isolation sheet
Remove the screws fixing the isolation sheet and then
remove the isolation sheet.
12. Remove 4-way valve assy and cut-off valve
Unsolder the welding joints connecting the 4-way valve
assy and cut-off valve, remove the 4-way valve and cut-
off valve.
Note:
Before unsoldering the welding joint, wrap the 4-way
valve with a wet cloth completely to avoid damage to
the valve caused by high temperature.
164
Procedure
Electric Box Assy
Service Manual
isolation sheet
4-way valve
Installation and Maintenance

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gwh07qa-k6dnc4a/iGwh07qa-k6dnc4a/oGwh09qa-k6dnb4aGwh09qa-k6dnb4a/iGwh09aga-k6dna1a/oGwh09qa-k6dnb2a ... Show all

Table of Contents