QUICK START GUIDE
Step 13 - Apply Power to Loads and Batteries Connected through Breakers
Rectifiers are keyed allowing only their installation into chargers of the same voltage.
1. Turn on BATT breaker if present
2. Verify DC output voltage with a meter on VDC+ and VDC– jacks on the Output Signal Unit.
Terminals voltage is output voltage ÷100.
3. Turn on load breaker(s) DC1 (and DC2 if present)
4. Verify No Ground Fault alarm - Ground Fault Unit U LED is Green and F LED NOT Red.
If F LED is Red, adjust values of resistance threshold down (R1 + R2).
Operate Test/Reset button after each adjustment.
If alarm continues, trouble shoot load and battery wiring accordingly.
Output Ground Fault Unit
Bottom Feed shown
Test/Reset Button
Information: Controller - View and Change Parameters and Alarm Severity
View and change system parameters and alarm severity
from the factory defaults via:
A. Front Display
B. LAN port in Local mode via a laptop (web pages)
C. LAN port in Network mode (web pages)
D. Craft Port via laptop and EasyView2 software or HyperTerminal.
Easy View2 (GUI) software can be downloaded from
See Pulsar Plus G3 Controller Product Manual for details.
Page 18
© 2021 ABB. All rights reserved.
LEDs
Output Ground Fault Unit
https://abbpowerconversion.com
R1 & R2
Output Signal Unit
Version 6.0