14. Using a nylon strap, support ring gear #20 from a hoist or boom, this ring gear is heavy.
Remove (8) bolts #37 leaving the top most bolt for last. Remove the final bolt while supporting
ring gear. Set ring gear aside. Remove the o-ring #52.
15. Remove spacer #26 and the output sun gear #15.
16. Using a large pair of snap ring pliers remove the snap ring #60 from the shaft located inside
the planetary carrier assembly #2.
17. Using a nylon strap and hoist slide the output planetary carrier #2 from the ring gear housing.
The output planetary carrier is heavy.
18. Remove the spacer #27.
52
20
37
27
2
60
15
26
9
OM-914207-0211-D