Electrical Components - Hitachi SAMURAI Series Service Manual

Air cooled water chillers and air to water heat pump
Hide thumbs Also See for SAMURAI Series:
Table of Contents

Advertisement

3. Servicing

Electrical components

3.6 Electrical components
3.6.1 Replacement of the electrical box assy
1 Unplug the connectors located rear to the electrical box.
Do this operation from inside the Chiller module.
2 Place lifting rings on the top of electrical box. Fasten a
textile belt to proceed to lift the electrical box.
C A U T I O N
Do not never use chains or metallic ropes to lift the Ebox as
they can damage it..
3 Hold the electrical box with the crane (or similar device)
through the 4 lifting rings.
4 Remove the 4 screws located on the top of electrical box.
99
SMGB0082 rev.1 - 07/2015
(x4) Screws
QCN7
QCN3
QCN5
QCN4
QCN8-1
QCN8-2
QCN13
QCN1
QCN2
3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rcme-ah1Rhme-ah1

Table of Contents