D-Link DXS-1210-28T Quick Installation Manual page 6

24-port 10gbase-t and 4-port 25gbase-x sfp28 managed switch
Table of Contents

Advertisement

Available languages

Available languages

B) Plug the AC power cord into the power socket of the Switch.
C) Slide the Retainer through the Tie Wrap until the end of the cord.
D) Circle the tie of the Retainer around the power cord and into the locker of the Retainer.
6

Advertisement

Table of Contents
loading

Table of Contents