Powering Up The Terminal; Configuring The Terminal; Checking Signal Strength - AddSecure Edge VS5010 User Manual

Hide thumbs Also See for Edge VS5010:
Table of Contents

Advertisement

7.8 Powering up the terminal

8 Configuring the terminal

8.1 Checking signal strength

page 8
⑪ Vout3, Power
A suitable emergency light and buzzer are available from AddSecure on
request.
The terminal is now installed, so the power supply can now be connected.
Switch the power on and check that the indicator "SYS LED" is flashing (top
green LED on PCBA). If it does not, you need to contact AddSecure.
The terminal does not need to be configured. All the configuration and
activation is done by AddSecure directly to the unit.
A good signal, at least 2 LEDs lit, is required in order to activate the terminal. To
see the current signal strength, press and hold the alarm button for at least five
seconds. The five LEDs will respond together, as a bar graph, to indicate the
signal strength. For example:
Low
Cellular signal
strength
When a Reflash is occurring, all the LEDs flash whilst the Reflash is
downloading and then stay on constantly during the re-programming.
This connection has 12 V output. It can, for example, be
used for the Call Connect.
Medium
Excellent
PDK-13010-v.6.0 Edge VS5010 and VS5051 User manual

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Edge VS5010 and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Edge vs5051

Table of Contents